{"created":"2023-05-15T12:36:04.035896+00:00","id":937,"links":{},"metadata":{"_buckets":{"deposit":"1696855b-cfb5-46b2-b1f9-b12b70e0c1ad"},"_deposit":{"created_by":2,"id":"937","owners":[2],"pid":{"revision_id":0,"type":"depid","value":"937"},"status":"published"},"_oai":{"id":"oai:kutarr.kochi-tech.ac.jp:00000937","sets":["16:21"]},"author_link":["2513"],"item_5_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2009-03","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"1","bibliographicVolumeNumber":"5","bibliographic_titles":[{"bibliographic_title":"Society for Social Management Systems Internet Journal"}]}]},"item_5_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"This study develops a probabilistic framework that can estimate the Life-Cycle Cost (LCC) of reinforced concrete (RC) structures under various construction and maintenance scenarios. This paper first describes a chloride-induced deterioration model to predict the service-life of RC structures. Then, the Monte-Carlo Simulation method is applied to the deterioration model and subsequent LCC estimation to assess the uncertainties of input variables probabilistically. This paper also discusses a case study in which the probabilistic Life-Cycle Cost Analysis (LCCA) framework is applied to a RC viaduct. The case study compares the potential ranges of LCC among eight different life-cycle scenarios. This study suggests that the developed probabilistic LCCA framework can be used as an effective decision-making method to identify the most cost-effective life-cycle scenario of RC structures, while reflecting the risk-attitude of the decision-maker.","subitem_description_type":"Abstract"}]},"item_5_publisher_36":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"Society for Social Management Systems"}]},"item_5_source_id_11":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"2432-552X","subitem_source_identifier_type":"ISSN"}]},"item_5_version_type_19":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"Kobayashi, Hideyuki"}],"nameIdentifiers":[{"nameIdentifier":"2513","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2019-02-13"}],"displaytype":"detail","filename":"SMS09-106.pdf","filesize":[{"value":"866.2 kB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"SMS09-106.pdf","url":"https://kutarr.kochi-tech.ac.jp/record/937/files/SMS09-106.pdf"},"version_id":"e48e0cfc-47da-429b-b1af-fecc699c4f59"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"Life-Cycle Cost Analysis","subitem_subject_scheme":"Other"},{"subitem_subject":"Reinforced Concrete","subitem_subject_scheme":"Other"},{"subitem_subject":"Monte-Carlo Simulation","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"eng"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"conference paper","resourceuri":"http://purl.org/coar/resource_type/c_5794"}]},"item_title":"Probabilistic Life-Cycle Cost Analysis for the Construction and Maintenance of Reinforced Concrete Structures","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"Probabilistic Life-Cycle Cost Analysis for the Construction and Maintenance of Reinforced Concrete Structures"}]},"item_type_id":"5","owner":"2","path":["21"],"pubdate":{"attribute_name":"公開日","attribute_value":"2018-02-06"},"publish_date":"2018-02-06","publish_status":"0","recid":"937","relation_version_is_last":true,"title":["Probabilistic Life-Cycle Cost Analysis for the Construction and Maintenance of Reinforced Concrete Structures"],"weko_creator_id":"2","weko_shared_id":-1},"updated":"2023-05-15T13:21:23.500666+00:00"}