ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. SSMSパブリケーション
  2. Vol.06

Lifecycle Cost Concept of Existing Buildings Based on The Seismic Performance

http://hdl.handle.net/10173/1795
http://hdl.handle.net/10173/1795
d07b864e-5778-4c68-99de-a7bed60b6ca5
名前 / ファイル ライセンス アクション
SMS10-180.pdf SMS10-180.pdf (164.2 kB)
Item type 会議発表論文 / Conference Paper(1)
公開日 2018-02-06
タイトル
タイトル Lifecycle Cost Concept of Existing Buildings Based on The Seismic Performance
言語
言語 eng
キーワード
主題Scheme Other
主題 office buildings
キーワード
主題Scheme Other
主題 life cycle cost
キーワード
主題Scheme Other
主題 earthquake damage
キーワード
主題Scheme Other
主題 seismic approach
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_5794
資源タイプ conference paper
著者 Nakata, Shinsuke

× Nakata, Shinsuke

Nakata, Shinsuke

Search repository
抄録
内容記述タイプ Abstract
内容記述 In Japan, almost all of buildings were considered as “consumables”. However steel products will run short in these 40 years in the world. The giant industrial waste will break out when reinforced concrete buildings are pulled down. Considering such conditions the new concept of durability of existing buildings is proposed here. This paper is discussed about the life cycle cost and asset management of existing reinforced concrete buildings based on the seismic performance. Extending the life of existing buildings to more than one hundred years, the occurrence possibility of giant earthquake is discussed and the installation of the base isolation system to existing buildings is proposed. Through the case analytical study of dynamic response to the buildings due to giant earthquake inputs the damage grade was evaluated among three cases of buildings; non-strengthened building, seismic strengthened building and base isolation building. The cost evaluation for such seismic device and running cost was discussed. The ratio of the initial construction cost to running cost of building showed that the building with high construction cost is much smaller than total life cycle cost to the building with cheaper initial construction cost from the viewpoint of the concept of asset management. Such running cost is composed of reconditioning, administration, effective management and preservation.In Japan usually the initial cost (construction cost) occupies around thirty percent of total life cycle cost (initial cost + running cost) Through the analytical process, following recommendations were proposed. (1) The installation of base isolation system to existing building is much effective to the viewpoint of asset management of existing buildings. (2) The damage of existing building which was based on the old seismic design code due to earthquake caused additional disadvantageous situation such as repair works and business loss during the repair works.
書誌情報 Society for Social Management Systems Internet Journal

巻 6, 号 1, 発行日 2010-03
ISSN
収録物識別子タイプ ISSN
収録物識別子 2432-552X
著者版フラグ
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
出版者
出版者 Society for Social Management Systems
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 13:17:22.175638
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3