ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. SSMSパブリケーション
  2. Vol.04

A Study on Feasibility Evaluation of a Gas Cogeneration System Considering Demand Fluctuation Risk

http://hdl.handle.net/10173/1694
http://hdl.handle.net/10173/1694
0548beaa-2916-4b21-961a-eebadadee9ff
名前 / ファイル ライセンス アクション
SMS08-156.pdf SMS08-156.pdf (176.8 kB)
Item type 会議発表論文 / Conference Paper(1)
公開日 2018-02-06
タイトル
タイトル A Study on Feasibility Evaluation of a Gas Cogeneration System Considering Demand Fluctuation Risk
言語
言語 eng
キーワード
主題Scheme Other
主題 gas cogeneration system
キーワード
主題Scheme Other
主題 economical analysis
キーワード
主題Scheme Other
主題 cost distribution
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_5794
資源タイプ conference paper
著者 Uchida, Kenetsu

× Uchida, Kenetsu

Uchida, Kenetsu

Search repository
Ishiguro, Yukako

× Ishiguro, Yukako

Ishiguro, Yukako

Search repository
Kagaya, Seiichi

× Kagaya, Seiichi

Kagaya, Seiichi

Search repository
抄録
内容記述タイプ Abstract
内容記述 Natural gas is highly demanded in various industries due to low emission of CO2 compared with the other fossil fuels. Natural gas cogeneration system which provides inhabitants living in an area with electricity and heat energy has high energy conversion efficiency. One of the challenges of the natural gas cogeneration system under the present situation where some counter measures against environmental issue are urgently required is its promotion. The natural gas cogeneration system is regarded as a good system to cope with environmental issues, however, the profitability of the system may prevent the promotion. In this study, a project scheme for the natural gas cogeneration system is developed, and an economical analysis method developed based on the scheme is also proposed. The stake holders addressed in the present study are project company, financial institution, gas supply company, local authority, and inhabitants of the district. The project company operates the cogeneration system without seeking a profit. The financial institution supplies funds to the project company with an interest rate. The gas supply company provides the project company with natural gas, and invests in the project. It is assumed that the local authority guarantees the debt of the project company, and that the guarantee of the debt by the local authority enables lower interest rate from the banking institution. Among the stake holders, a cooperative behavior is assumed. Accordingly, the behavior by the stake holders is not to maximize their own benefits by the project but to maximize the total benefit subject to the constraint where no stake holder has debt by the project. Distributions on costs and benefits among the stake holders were clarified by an analysis carried out by assuming that the natural gas cogeneration system was introduced to downtown Sapporo. All of the stakeholders received positive net benefit form the project.
書誌情報 Society for Social Management Systems Internet Journal

巻 4, 号 1, 発行日 2008-03
ISSN
収録物識別子タイプ ISSN
収録物識別子 2432-552X
著者版フラグ
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
出版者
出版者 Society for Social Management Systems
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 13:21:53.892217
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3