ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "fae66e68-f127-469c-84e9-3dd31ea2c79b"}, "_deposit": {"created_by": 2, "id": "938", "owners": [2], "pid": {"revision_id": 0, "type": "depid", "value": "938"}, "status": "published"}, "_oai": {"id": "oai:kutarr.kochi-tech.ac.jp:00000938", "sets": ["21"]}, "author_link": ["2516", "2515", "2514"], "item_5_biblio_info_7": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2009-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "1", "bibliographicVolumeNumber": "5", "bibliographic_titles": [{"bibliographic_title": "Society for Social Management Systems Internet Journal"}]}]}, "item_5_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "There are very many road bridges in Japan, and these bridges are exposed to severe environment and starting to deteriorate. The process of finding the best Bridge Management Plan under the budgetary constraint is complicated, a great amount of effort has been made to develop Bridge Management System (BMS). Most of these BMS are useful in the planning process, but not many are useful in the execution process of bridge management, such as maintenance works, repair works, rehabilitation and replacement works. The Bridge Management System developed for Aomori Prefectural Government has unique and useful functions such as “Knowledge Base Deterioration Prediction Method”, “Management Scenario Concept” and “Budget Simulation”. After the process of Budget Simulation, the maintenance scenarios of all bridge are determined when the long term budgetary plan is determined. It means that the performance requirements are determined for all bridge components when the mid and long-term bridge management plan are determined. Therefore, it is possible to use data obtained from our BMS and make a “Performance Based Contracting” for the bridge maintenance and preservation works.", "subitem_description_type": "Abstract"}]}, "item_5_publisher_36": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "Society for Social Management Systems"}]}, "item_5_source_id_11": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "2432-552X", "subitem_source_identifier_type": "ISSN"}]}, "item_5_version_type_19": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_970fb48d4fbd8a85", "subitem_version_type": "VoR"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Kaneuji, Makoto"}], "nameIdentifiers": [{"nameIdentifier": "2514", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Kawamura, Hiroaki"}], "nameIdentifiers": [{"nameIdentifier": "2515", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Watanabe, Eiichi"}], "nameIdentifiers": [{"nameIdentifier": "2516", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2019-02-13"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "SMS09-107.pdf", "filesize": [{"value": "153.6 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 153600.0, "url": {"label": "SMS09-107.pdf", "url": "https://kutarr.kochi-tech.ac.jp/record/938/files/SMS09-107.pdf"}, "version_id": "caded389-1c5a-4ab1-a1c4-b7dbd0233d46"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "Bridge Management System", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Asset Management Contract", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Performance Based Contract", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "conference paper", "resourceuri": "http://purl.org/coar/resource_type/c_5794"}]}, "item_title": "Development of BMS and Possibility of Performance Based Contracting Using BMS", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Development of BMS and Possibility of Performance Based Contracting Using BMS"}]}, "item_type_id": "5", "owner": "2", "path": ["21"], "permalink_uri": "http://hdl.handle.net/10173/1721", "pubdate": {"attribute_name": "公開日", "attribute_value": "2018-02-06"}, "publish_date": "2018-02-06", "publish_status": "0", "recid": "938", "relation": {}, "relation_version_is_last": true, "title": ["Development of BMS and Possibility of Performance Based Contracting Using BMS"], "weko_shared_id": -1}
  1. SSMSパブリケーション
  2. Vol.05

Development of BMS and Possibility of Performance Based Contracting Using BMS

http://hdl.handle.net/10173/1721
http://hdl.handle.net/10173/1721
89e2854b-42d9-4984-9b12-472219612e05
名前 / ファイル ライセンス アクション
SMS09-107.pdf SMS09-107.pdf (153.6 kB)
Item type 会議発表論文 / Conference Paper(1)
公開日 2018-02-06
タイトル
タイトル Development of BMS and Possibility of Performance Based Contracting Using BMS
言語
言語 eng
キーワード
主題Scheme Other
主題 Bridge Management System
キーワード
主題Scheme Other
主題 Asset Management Contract
キーワード
主題Scheme Other
主題 Performance Based Contract
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_5794
資源タイプ conference paper
著者 Kaneuji, Makoto

× Kaneuji, Makoto

WEKO 2514

Kaneuji, Makoto

Search repository
Kawamura, Hiroaki

× Kawamura, Hiroaki

WEKO 2515

Kawamura, Hiroaki

Search repository
Watanabe, Eiichi

× Watanabe, Eiichi

WEKO 2516

Watanabe, Eiichi

Search repository
抄録
内容記述タイプ Abstract
内容記述 There are very many road bridges in Japan, and these bridges are exposed to severe environment and starting to deteriorate. The process of finding the best Bridge Management Plan under the budgetary constraint is complicated, a great amount of effort has been made to develop Bridge Management System (BMS). Most of these BMS are useful in the planning process, but not many are useful in the execution process of bridge management, such as maintenance works, repair works, rehabilitation and replacement works. The Bridge Management System developed for Aomori Prefectural Government has unique and useful functions such as “Knowledge Base Deterioration Prediction Method”, “Management Scenario Concept” and “Budget Simulation”. After the process of Budget Simulation, the maintenance scenarios of all bridge are determined when the long term budgetary plan is determined. It means that the performance requirements are determined for all bridge components when the mid and long-term bridge management plan are determined. Therefore, it is possible to use data obtained from our BMS and make a “Performance Based Contracting” for the bridge maintenance and preservation works.
書誌情報 Society for Social Management Systems Internet Journal

巻 5, 号 1, 発行日 2009-03
ISSN
収録物識別子タイプ ISSN
収録物識別子 2432-552X
著者版フラグ
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
出版者
出版者 Society for Social Management Systems
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 13:21:21.202050
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3