WEKO3
アイテム
Remaining Service Life Based Maintenance Strategy for Railway Bridges
http://hdl.handle.net/10173/1747
http://hdl.handle.net/10173/1747866e741b-9f5f-4232-a68d-8d9435ffff55
名前 / ファイル | ライセンス | アクション |
---|---|---|
SMS09-108.pdf (340.3 kB)
|
|
Item type | 会議発表論文 / Conference Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2018-02-06 | |||||
タイトル | ||||||
タイトル | Remaining Service Life Based Maintenance Strategy for Railway Bridges | |||||
言語 | ||||||
言語 | eng | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | maintenance strategy | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | fatigue life | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | riveted bridge | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | structural appraisal | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_5794 | |||||
資源タイプ | conference paper | |||||
著者 |
Ohga, Mitao
× Ohga, Mitao× Siriwardane, Sudath Chaminda× Dissanayke, Ranjith× Kaita, Tatsumasa |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | This paper proposes an essential maintenance strategy for riveted railway bridges based on an accurate remaining fatigue life estimation technique. The strategy mainly consists of structural appraisal based critical members and connections identification, remaining fatigue lives estimation of critical connections and time dependent member replacement or strengthening scheme. In the stage of critical member identification, detailed structural appraisal has to be conducted giving priority to visual inspection for condition, FE analysis, and material testing, experimental static and dynamic load testing. Accurate fatigue life estimation techniques of both members and connections consist of measured stress histories and recently developed new fatigue models. A verification of the proposed strategy is conducted by comparing the predicted replacement scheme with sequence of experimental failure and fatigue life of selected test specimens. Finally, the proposed strategy was applied to a case study railway bridge to obtain time dependent member replacement scheme and obtained results are compared with previous estimations. Hence, validity and merits of proposed strategy were confirmed. | |||||
書誌情報 |
Society for Social Management Systems Internet Journal 巻 5, 号 1, 発行日 2009-03 |
|||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 2432-552X | |||||
著者版フラグ | ||||||
出版タイプ | VoR | |||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |||||
出版者 | ||||||
出版者 | Society for Social Management Systems |